Get your crews sending, and your documents flowing
Short, practical walkthroughs for setting up Vistwerk on a real fiber project — from the first WhatsApp message to a filed Fertigstellungsanzeige.
Setting up WhatsApp intake for a Tiefbau crew
Connect a number, brief the crews in one toolbox talk, and start turning voice notes into documentation — without changing how anyone works on site.
10 min read
Configuring per-project Evd targets
Why the TerraTest PDFs ship with Geforderter Evd = 0, and how to set the real Gehweg target (typically ≥ 40 MN/m²) per project.
6 min read
CompliancePairing vorher/nachher plate-load tests
Why filename labels are unreliable and how GPS-and-time pairing keeps before/after tests matched to the right spot.
5 min read
Daily useReading the review queue
What lands below the 0.7 confidence floor, why, and how a two-click confirm keeps wrong codes out of the Aufmaß.
4 min read
DocumentsReturning the Rückmeldedatei
How Vistwerk fills the IST cells back into the carrier's Bauzeitenplan template instead of rebuilding it from scratch.
5 min read
Daily useWorking across multiple subcontractors
Keeping SunBau, Maktec, and everyone else in their own sections so the Tagesbericht and dashboard never collapse the subs together.
6 min read