For the Generalunternehmer who carries the record for every sub

Telekom holds you accountable for the rollout, but the work is done by SunBau, Maktec, and whoever else is on the Bauabschnitt that week. You roll the day up across all of them and file the Fertigstellungsanzeige with Stadt Maintal — a form where your own name never appears. Vistwerk keeps the full, sub-grouped record behind that filing, so the paperwork holds up even though you're invisible on it.

Fertigstellungsanzeige
Stadt Maintal · Anlage 1
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Geprüft

You sign for work three other firms did

Every report you file is built from days you didn't run, sent up to a carrier and a city that expect one clean, complete record.

Rolling up across subs by hand

SunBau's day, Maktec's day, the third sub's day — you merge them into one Tagesbericht and hope nobody's meters got dropped in the copy-paste.

Invisible on the form, liable behind it

The Fertigstellungsanzeige names Stadt Maintal, Deutsche Telekom Technik, and only SunBau as Ausführende. You file it — but the record proving the work has to be yours.

A record that can't have gaps

TerraTest Evd attachments, who worked which Bauabschnitt, which crew sent what — if any of it is missing when a Bauabschnitt is queried, the dispute lands on you.

What changes with Vistwerk

The roll-up is automatic and the trail is complete — across every sub, never collapsed into one.

Rolled up

One day, every sub, correctly sectioned

The Tagesbericht assembles itself across SunBau, Maktec, and any other sub that worked — each in its own section — so the day Telekom sees is complete without you merging spreadsheets at night.

  • Sub-grouped sections, never one flat list
  • Every sub's meters and crews accounted for
  • Each entry traces back to the crew that sent it
vistwerk.com/dashboard
Übersicht
Tagesbericht
Aufmaß
Review
Projekte
Tagesbericht · roll-up
142
Berichte
3
Subs
98%
Geprüft
SunBau Tiefbau
Bauabschnitt 3
OK
Maktec Bau
Bauabschnitt 5
OK
SunBau Tiefbau
Bauabschnitt 1
Review
Filed

The Fertigstellungsanzeige, with the record behind it

Vistwerk fills the Stadt Maintal Anlage-1 template — Stadt Maintal as owner, Deutsche Telekom Technik as filer/stamp, SunBau as Ausführende — and attaches the GPS-paired TerraTest Evd PDFs. You stay invisible on the form and defensible behind it.

  • Stadt Maintal template, Telekom stamp, SunBau as Ausführende
  • TerraTest Evd PDFs attached as Anlage
  • Full sub-grouped trail kept for when a Bauabschnitt is queried
Fertigstellungsanzeige
Stadt Maintal · Anlage 1
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Geprüft
3-tier
Telekom → GU → Subs
one record across the whole chain
Sub-grouped
Never collapsed
each sub stays its own section
Anlage 1
Stadt Maintal form
filed with TerraTest Evd attached

Keep a record that holds up

Bring a recent Fertigstellungsanzeige and the TerraTest PDFs behind it. We'll show you the filing and the sub-grouped trail Vistwerk keeps.