Skip to main content
VistwerkVISTWERK
Document

Fertigstellungsanzeige Stadt Maintal's Anlage 1, filled correctly

The completion notice that tells Stadt Maintal a section is done — on the city's own Anlage-1 template, carrying Deutsche Telekom's filing stamp and the TerraTest plate-load PDFs as Anlage. Vistwerk fills the right entity into each block, names the right firm as Ausführende, and keeps the Generalunternehmer off the form where it belongs.

Fertigstellungsanzeige
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Geprüft

Who goes where on the form

The Anlage-1 form has three fixed entity blocks. Filling the wrong name into the wrong block is the mistake Vistwerk removes.

Template owner
Stadt Maintal — the form is the city's Anlage 1, its logo and footer
Filer / stamp
Deutsche Telekom Technik GmbH, TNL Südwest, PTI134
Recipient
Stadt Maintal Betriebshof — where the notice is filed
Ausführende
Only the sub that did the work (e.g. SunBau) — the GC is invisible
Section completed
Bauabschnitt, street, and the dates of completion
Anlage
TerraTest plate-load test PDFs attached as evidence

From finished section to filed notice

Three steps to a form Stadt Maintal accepts the first time.

  1. 01

    Section reported done

    The crew's messages and the daily records show the Bauabschnitt finished — surface restored, tests run, work signed off in review.

  2. 02

    Entities and tests assembled

    Vistwerk drops Stadt Maintal, the Telekom filing stamp, and the Betriebshof recipient into their blocks, names the executing sub as Ausführende, and pulls the matching TerraTest PDFs.

  3. 03

    Fertigstellungsanzeige ready to file

    The Anlage-1 form lands complete with the plate-load PDFs as Anlage — the GC nowhere on it, ready to send to the city.

File a Fertigstellungsanzeige Stadt Maintal accepts

Show us a finished Bauabschnitt and its tests. We'll show you the Anlage-1 notice — right entities, right Ausführende, TerraTest PDFs attached.

Fertigstellungsanzeige — Vistwerk