Fertigstellungsanzeige Stadt Maintal's Anlage 1, filled correctly
The completion notice that tells Stadt Maintal a section is done — on the city's own Anlage-1 template, carrying Deutsche Telekom's filing stamp and the TerraTest plate-load PDFs as Anlage. Vistwerk fills the right entity into each block, names the right firm as Ausführende, and keeps the Generalunternehmer off the form where it belongs.
Who goes where on the form
The Anlage-1 form has three fixed entity blocks. Filling the wrong name into the wrong block is the mistake Vistwerk removes.
From finished section to filed notice
Three steps to a form Stadt Maintal accepts the first time.
- 01
Section reported done
The crew's messages and the daily records show the Bauabschnitt finished — surface restored, tests run, work signed off in review.
- 02
Entities and tests assembled
Vistwerk drops Stadt Maintal, the Telekom filing stamp, and the Betriebshof recipient into their blocks, names the executing sub as Ausführende, and pulls the matching TerraTest PDFs.
- 03
Fertigstellungsanzeige ready to file
The Anlage-1 form lands complete with the plate-load PDFs as Anlage — the GC nowhere on it, ready to send to the city.
File a Fertigstellungsanzeige Stadt Maintal accepts
Show us a finished Bauabschnitt and its tests. We'll show you the Anlage-1 notice — right entities, right Ausführende, TerraTest PDFs attached.