Skip to main content
VistwerkVISTWERK
Produce

Evd targets, paired plate-load tests, and the form Stadt Maintal accepts

TerraTest plate-load PDFs ship with Geforderter Evd = 0 — no threshold encoded, so nothing on the page tells you whether 41 MN/m² passed. Vistwerk sets the real per-project target, pairs the vorher/nachher tests by GPS instead of the unreliable filenames, and drops them into the Stadt-Maintal Fertigstellungsanzeige with the Deutsche Telekom Technik PTI134 stamp.

Fertigstellungsanzeige
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Geprüft
≥ 40
Gehweg Evd target
MN/m² — the real threshold, set per project
GPS < 5 m
Vorher/nachher paired
by location and time, not by filename
PTI134
Telekom Technik stamp
filer block on the Stadt-Maintal form
Evd targets

A real threshold, because the PDF doesn't carry one

Every TerraTest sheet says Geforderter Evd = 0 — the machine never knew the target, so a passing 41 and a failing 32 look identical on the page. Vistwerk holds the per-project target — typically ≥ 40 MN/m² on a Gehweg — and checks each measured Evd against it, so a fail is caught before the Fertigstellungsanzeige goes out, not after.

  • Per-project Evd target set once — Gehweg, road, whatever the spec demands
  • Every measured Evd checked against the real number, not the PDF's zero
  • A below-target result is flagged, not filed
Evd check — measured 41 MN/m² against the ≥ 40 targetPreview
Plate-load pairing

Vorher and nachher matched by GPS, not by filename

The filenames lie — one sampled pair sits ~40 m apart at different house numbers, and a vorher is dated after its nachher. Vistwerk pairs each before/after by GPS proximity under 5 m and time order, so the compaction proof actually compares the same spot before and after backfill.

  • Paired by GPS distance under 5 m, then by time order
  • Filename labels treated as a hint, never as the source of truth
  • Mismatched or distant pairs surface for a person to resolve
vistwerk.com/dashboard
Übersicht
Tagesbericht
Aufmaß
Review
Projekte
Plate-load pairing
142
Berichte
3
Subs
98%
Geprüft
SunBau Tiefbau
Bauabschnitt 3
OK
Maktec Bau
Bauabschnitt 5
OK
SunBau Tiefbau
Bauabschnitt 1
Review
Fertigstellungsanzeige

Stadt Maintal's form, the Telekom stamp, the tests attached

The completion notice is Stadt Maintal's Anlage-1 template — not something we invent. It carries three blocks: Stadt Maintal as template owner, Deutsche Telekom Technik GmbH TNL Südwest PTI134 as the filer stamp, and Stadt Maintal Betriebshof as recipient. The Generalunternehmer stays invisible on the form; only the Nachunternehmer is named as Ausführende, and the passing TerraTest PDFs attach as Anlage.

  • Stadt Maintal's Anlage-1 layout, with the PTI134 filer stamp
  • GC invisible; only the Nachunternehmer named as Ausführende
  • Passing TerraTest PDFs attached as Anlage to the notice
Fertigstellungsanzeige
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Geprüft

Bring us your TerraTest PDFs

Send a vorher/nachher set and your Gehweg Evd target — we'll pair them by GPS and show the Fertigstellungsanzeige they belong to.

Compliance engine — Vistwerk