Produce

Five German documents, built from the field record

Once the day's voice notes and photos clear review, Vistwerk assembles the documents the project actually needs — the sub-grouped Tagesbericht, the daily Aufmaß, the carrier's Rückmeldedatei filled back in, and the Stadt-Maintal Fertigstellungsanzeige. Each one matches the format the recipient already expects, so nothing gets bounced for the wrong layout.

Tagesbericht
Sub-grouped · Maintal FTTH · Los 2
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
5
Document types
Tagesbericht, Aufmaß, Rückmeldedatei, Fertigstellungsanzeige, Fotodokumentation
by sub
Tagesbericht grouped
sectioned by Nachunternehmer, rolled up by the GC
template
Rückmeldedatei
the carrier's own XLSX, returned with IST cells filled
Tagesbericht

One daily report, grouped by subcontractor

The Generalunternehmer files one Tagesbericht a day covering every sub that worked — SunBau on the Gehweg, Maktec on the next Bauabschnitt. Vistwerk keeps each Nachunternehmer in its own section instead of blending crews together, so the report reads the way Oppidom needs to file it.

  • Sectioned per Nachunternehmer — subs are never collapsed into one list
  • Rolled up across every crew that worked that day
  • Built from entries that already cleared the review queue
Tagesbericht
SunBau · Maktec · 07.06.2026
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Aufmaß

A daily Aufmaß of hours, materials, and machines

This is the per-workday tally the client actually keeps — crew hours, materials laid, machines on site — not a priced billing summary. Vistwerk builds it from the same field entries, so the day's metres of Gehweg and the Verbau pulled are counted once and carried straight through.

  • Crew hours, materials, and machines per workday
  • A tally, not an invoice — pricing stays out of the field record
  • Numbers carried from the reviewed entries, counted once
Aufmaß
Tages-Aufmaß · Stunden · Material · Geräte
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Rückmeldedatei & forms

Templates filled in, not rebuilt from scratch

The weekly Rückmeldedatei is the carrier's own Bauzeitenplan workbook returned with the IST cells filled — Vistwerk opens the uploaded XLSX, writes the progress in, and hands back the same file. The Fertigstellungsanzeige uses Stadt Maintal's Anlage-1 form exactly. The Fotodokumentation is still in design, pending the client's reference template — and we say so rather than ship a placeholder.

  • Rückmeldedatei: the uploaded XLSX returned with IST cells written in
  • Fertigstellungsanzeige: Stadt Maintal's Anlage-1 form, unchanged
  • Fotodokumentation: in design, awaiting the client's reference template
Rückmeldedatei — IST cells filled into the carrier's own workbookPreview

See your own documents come out

Send us the templates you file today — the Bauzeitenplan, the Aufmaß sheet — and we'll show you them filled from a day of field messages.