Skip to main content
VistwerkVISTWERK
By use case

From a WhatsApp voice note to a filed Tagesbericht

Leon sends a 14-second voice note from Bauabschnitt 3. By the time the Bauleiter looks, it is already transcribed, the HK code is matched against the Ablauf-Programm, and it is sitting in the right section of the day's Tagesbericht. Vistwerk runs the whole path — capture, transcription, code-matching, review — so the report is a draft to approve, not a form to fill.

SB
SunBau · Kolonne Leon
Maintal · Bauabschnitt 3
0:14
08:42
08:43

HK 4R/79 fertig, 28 m Gehweg, Verbau gezogen

08:43 ✓✓
One voice note, one photo, one line of text — that's the input

The field already reports — into the wrong place

Crews send everything you need over WhatsApp. The problem is what happens after it lands: nobody reads a chat log and gets a Tagesbericht for free.

Two languages, one chat

Leon writes German, Necmettin's voice notes are Turkish. A person re-keying at 18:00 has to follow both — and mishears the one that isn't their first language.

Codes buried in audio

"HK 4R/79 fertig" is spoken, not typed. The code that drives the Aufmaß is sitting inside a voice note nobody has time to replay and verify against the plan.

Nothing is grouped

Three crews, two subcontractors, one flat thread. The Tagesbericht has to be sub-grouped, and the chat gives you no structure to start from.

The path Vistwerk runs end to end

Capture stays on WhatsApp. Everything after it is automatic, with a review step before anything reaches a document.

Capture and transcribe

Voice, photo, and text come in as they're sent

No app on the truck. Voice notes are transcribed with auto language detection — German and Turkish in the same thread — and every message keeps its original audio and photos attached for the record.

  • Whisper auto-detect per message: DE + TR
  • Photos and original audio stay on each entry
  • Sender tagged to its Nachunternehmer automatically
SB
SunBau · Kolonne Leon
Maintal · Bauabschnitt 3
0:14
08:42
08:43

HK 4R/79 fertig, 28 m Gehweg, Verbau gezogen

08:43 ✓✓
SunBau · Kolonne Leon · Bauabschnitt 3
Match and review

Codes matched against the plan, the rest sent to review

Every HK and NVt token is fuzzy-matched against the project's schedule_rows from the Ablauf-Programm. Anything below 0.7 confidence stops in the review queue with the original audio one tap away — nothing reaches a document until it clears.

  • Fuzzy match against the Ablauf-Programm schedule
  • Below 0.7 confidence → review queue, never silent
  • Output: the sub-grouped Tagesbericht and the daily Aufmaß
vistwerk.com/dashboard
Übersicht
Tagesbericht
Aufmaß
Review
Projekte
Review queue
142
Berichte
3
Subs
98%
Geprüft
SunBau Tiefbau
Bauabschnitt 3
OK
Maktec Bau
Bauabschnitt 5
OK
SunBau Tiefbau
Bauabschnitt 1
Review
DE + TR
Auto language detect
German and Turkish in one thread
< 0.7
Confidence floor
below it, it goes to review
2 docs
Out of one day
Tagesbericht and daily Aufmaß

Send us a real day from the field

One crew's WhatsApp thread — voice notes, photos, the lot. We'll run it through and hand you the Tagesbericht and Aufmaß it produces.

Field reporting — Vistwerk