For the Bauleiter who writes the Tagesbericht after dark
Your crews finished at 16:30. The daily report still has to be written, grouped by subcontractor, with the right HK codes and meters. Vistwerk assembles it from the WhatsApp messages they already sent — so the Tagesbericht is waiting for you, not the other way around.
The day's work is in 40 WhatsApp messages
By the time you sit down to report, the field has gone quiet and the detail is scattered across chats from three crews.
Re-keying everything
Voice notes get replayed, photos get squinted at, and numbers get typed into a spreadsheet a second time — at 18:00, when mistakes happen.
Grouping by subcontractor
Telekom and the GC want the day grouped by sub. Doing that by hand from a flat chat log is slow and easy to get wrong.
Codes you can't verify
Was it HK 4R/79 or 6R/75? A wrong code now becomes a wrong Aufmaß later, and a payment dispute after that.
What changes with Vistwerk
The report writes its first draft from the field. You review, you don't re-type.
The Tagesbericht arrives sub-grouped
Every message is tagged to the subcontractor that sent it, so the report lands already sectioned by SunBau, Maktec, and anyone else who worked that day.
- Sub-grouped sections, not one flat crew list
- Weather, personnel, and work pulled from the messages
- Ready before you open your laptop
Codes matched against the plan, not your memory
Each HK and NVt code is matched against the project schedule before it reaches the report. Anything uncertain is flagged for a two-click confirm instead of guessed.
- Fuzzy-matched against the Ablauf-Programm schedule
- Uncertain codes surface in a review queue
- The crew's original audio stays one tap away
Get your evenings back
Bring one crew's WhatsApp chat from a real day. We'll hand you the Tagesbericht it produces.