Skip to main content
VistwerkVISTWERK
By role

For the QA lead who has to prove the Gehweg actually passed

A TerraTest plate-load PDF ships with Geforderter Evd = 0 — no threshold, no pass/fail. The vorher/nachher pair is labelled by filename, and the filenames don't line up. Vistwerk sets the Evd target per project, pairs each before/after by GPS and time instead of trusting the label, and keeps the original audio and photo on every entry so the whole record is defensible.

TerraTest Evd
Gehweg ≥ 40 MN/m² · vorher/nachher
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Geprüft

The test ships without the threshold it's tested against

Every TerraTest PDF reads Geforderter Evd = 0, so nothing in the file tells you whether the Gehweg passed — that judgement has to come from somewhere reliable.

No target encoded in the PDF

Geforderter Evd = 0 on all of them means the pass line lives only in someone's head until a project sets it — typically ≥ 40 MN/m² for a Gehweg.

Filenames lie about the pair

The vorher and nachher of one spot can sit at house numbers 40 m apart in the filenames. Pairing on the label quietly compares the wrong two measurements.

No way back to the source

When an entry is questioned weeks later, you need the original voice note and photo it came from — not a transcribed number with nothing behind it.

What changes with Vistwerk

The target, the pairing, and the audit trail are set once and applied to every test — not re-judged by hand.

Threshold + pairing

Evd target per project, pairs by GPS not filename

You set the required Evd once per project — ≥ 40 MN/m² for a Gehweg — and Vistwerk holds each measurement against it. Vorher/nachher are matched by GPS within 5 m and time order, so the before and after are genuinely the same spot.

  • Per-project Evd target, applied to every sample
  • Vorher/nachher paired by GPS (<5 m) and time, not filename
  • Pass or fail decided against your threshold, not a blank field
TerraTest Evd
≥ 40 MN/m² · GPS-paired
ProjektMaintal FTTH · Los 2
Datum07.06.2026
AusführendeSunBau Tiefbau GmbH
Trail

Review queue and a source for every entry

Codes below the 0.7 confidence floor go to a review queue before they reach any document, and each entry keeps the original audio and photo it came from — so a queried Bauabschnitt opens back to its source in one tap.

  • Uncertain codes held in review, never auto-filed
  • Original audio and photo attached to every entry
  • Nothing reaches a document until it clears review
vistwerk.com/dashboard
Übersicht
Tagesbericht
Aufmaß
Review
Projekte
Review queue
142
Berichte
3
Subs
98%
Geprüft
SunBau Tiefbau
Bauabschnitt 3
OK
Maktec Bau
Bauabschnitt 5
OK
SunBau Tiefbau
Bauabschnitt 1
Review
≥ 40
MN/m² Gehweg target
set per project, applied to every test
<5 m
GPS pairing
vorher/nachher matched by location, not label
<0.7
Confidence floor
uncertain entries routed to review

Make every test defensible

Bring a set of TerraTest PDFs from one Bauabschnitt. We'll set the Evd target, pair them by GPS, and show you what passes.

For quality assurance — Vistwerk